CHINA - Shaijo Project
Larkin Enterprises, Inc. ( LEI ) provided Start-up Manager
and Engineers for three 600 Mega-watt Coal Burning Power Plants.
BELLINGHAM, MA
LEI provided staff personnel to include Construction Manager,
Project Control, Cost Control, and Schedulers. Provide Commission
support to include Start-up Engineers, Instrument and Control Technicians,
and supporting craft.
Electrical Support: Installation of ISO-PHASE BUS,
Grounding grid, External and Internal equipment grounding.
KILLINGLY, CT - Lake Road
Project
LEI provided personnel to include: Construction Managers,
Project Controls, Scheduling and Commissioning support. Commissioning
support included Start-up Engineers, Instrument and Control Technicians,
and Electrical, and Instrument and Control Technicians.
Electrical Support: Completed all Construction,
Terminations, and Testing to allow Energization of 345KV Switchyard.
Installed all Electrical wiring and apparatus for the ACC units.
(Air Cooled Condensers)
BLACKSTONE, MA
LEI provided staff personnel to include: Construction Manager,
Project Controls, Scheduling and Commissioning Support. Provided
Commission support to include Start-up Engineers, Instrument and
Control Technicians, and supporting craft.
Installation and Calibration of all Process Control
Instruments.
MASSENA, NY
LEI supported installation of boiler units at ALCOA Aluminum
Plant in Massena, NY.
WISCASSET, ME - Spent Fuel
Island Project January - October 1998
LEI supplied Staff to include Planners, Electrical Engineers,
Schedulers, and Instrumentation and Control Technicians for Modification
of the Spent Fuel Pool as a "Stand Alone" system. Redesigned
and developed installation and testing instructions for the Primary
Vent Stack particulate and tritium sampling system to meet decommissioned
plant regulatory requirements. Work in the field included: Writing
FCN's, work package closeout, ordering of material and adherence
to all Nuclear Regulatory Commission (NRC) guidelines. Work Package
preparation and field implementation included: a 115KV/480V distribution
system, weatherproof distribution bus, 480V MCC, pumps, HVAC systems,
cooling tower, PLC (programmable logic controller) controls, fire
alarm and security system. Designed and installed Control Room and
Fire Protection interfaces with the PLC.
COVERT, MI - PALISADES NUCLEAR
PLANT
Larkin Enterprises, Inc. ( LEI ) provided Craft Supervision,
Craft personnel, transportation, tools, and equipment for the scaffolding
and shielding program at the Palisades Nuclear Plant during the
Fall 1999 Refueling outage.
RUMFORD, ME
LEI provided Union Carpenters and Millwrights, Start-up Engineers
and Instrumentation and Control Technicians to support construction
and start-up of a Combined Cycle gas turbine plant.
Tiverton, RI
LEI provided Project Managers, Schedulers, Electrical and
I&C Supervision, Certified Welders, Fitters and Craft Technicians
for installation and commissioning of Instrumentation and Switch
yard Protective Relays on a Conbined Cycle GE-Mark 5 Power Plant.
PLYMOUTH, MA - Pilgram Station
LEI has an ongoing contract to provide Instrumentation and
Control and Electrical Engineering support at Pilgrim Station. Support
also included Review and upgrade of the Instrument Set Point Calculation
Program and the Plant Life Extension.
| FLORIDA
POWER CORPORATION |
CRYSTAL RIVER, FL
LEI provided Instrumentation and Control and Electrical Engineering
support (including "Loop Accuracy Calculations", etc.)
for Framatone Technologies.
WISCASSET, ME - Control
Room Design Change January - October 1998
Larkin Enterprises, Inc. ( LEI ) provided Staff to include
Planners, Electrical Engineers, and Schedulers for Main Control
Room relocation to facilitate decommissioning. Moved Meteorological
system instrumentation from the existing Control Room to the New
Control Room including original system "as-built", new
cabinet layout, and actual instrument removal and installation.
WISCASSET, ME - Restart
1997
LEI supported Maine Yankee with all disciplines of Engineering
and Instrumentation and Controls Technicians, work package Planners,
and Schedulers. This was a major restart effort which encountered
and resolved many discrepancies identified by NRC audits, including
cable separation and High Line Break modifications and NRC generic
letter 96-01 testing.
KILLINGLY, CT - Lake Road
Project
LEI provided the Installation and Calibration of all instrumentation
for three units, including instrument tubing and electrical conduits
and cable. Support Craft for Scaffolding, Carpentry, Site cleaning,
and Punch-List items.
BROWNVILLE, NE - COOPER
STATION
LEI provided Nebraska Power with Planning, Scheduling, Engineering,
and Construction Management for the Optimum Water Chemistry Project
at Cooper Nuclear Station.
Project tasks included: Preparation of a feasibility
study which dealt with the probability of failure of reactor components
and their associated repair/replacement costs, Presentation to the
Nebraska Public Power District Board of Directors for the implementation
of the Optimum Water Chemistry (OWC) system which included Capital
Cost Justification versus Repair/Replacement costs, Contract Preparation,
Overall project Scheduling, Management of start-up and test, project
turn over to operations and maintained control.
MILLSTONE, CT
LEI supplied Engineers, Designers, and support Craft to facilitate
the decommissioning of Millstone Unit 1 in Connecticut.
POINT BEACH NUCLEAR PLANT
April 1999 - Present
Larkin Enterprises, Inc. ( LEI ) supported the successful
Re-Start effort. Providing an on-going staff augmentation to include
Planners, Engineers, Quality Control Inspectors, Supervisors, and
supporting Craft.
BRIDGEPORT, CT - September
1999 - Present
LEI provided on-going staff augmentation including Planners,
Electrical Field Engineers, Instrumentation and Control Technicians
and Construction Management.
Projects include: The refurbishment of Air Operated
Control Valves and Motor Operated Valves during the Fall 1999 outage.
Engineered control changes to upgrade Air Operated Controls to State
of the Art digital programmable controls. Supervised the removal,
rebuild, and reinstallation of Limit torque MOV's. Set limits, Torque
switches and functional tested valves. Engineered installation of
new motor starters for valves. Continually troubleshooting and repairing
various Electrical and Instrumentation Systems.
|
 |
 |
 |
|
 |
 |
| |
Larkin Enterprises awarded the I&C Work at Xcel Energy’s Alan S. King Plant. more |
|
| |
 |
|
| |
Larkin Enterprises, Inc. becomes approved vendor for Shaw/Stone
and Webster. more |
|
| |
|
|
 |
| |